Recipient |
County |
Project Description |
Grant Award |
|
Rocky Fork State Park |
Highland |
Extend the existing East Shore launch ramp and courtesy dock 10'; make dock ADA accessible. |
$4,784 |
|
City of Mansfield |
Morrow |
Remove and replace existing launch ramp at Clearfork Reservoir with a three-lane launch ramp. Improve access drive and parking areas. |
$125,250 |
|
ODNR Division of Parks & Recreation |
Statewide |
New dredging equipment. |
$148,000 |
|
Rocky Fork State Park |
Highland |
Extend the existing campground launch ramp and courtesy dock 10' and make dock ADA accessible. |
$4,980 |
|
Lorain Port Authority |
Lorain |
Upgrade of existing Eastside launch ramp. |
$57,796 |
|
Grand Lake/St. Marys
State Park |
Mercer |
Extend existing concrete launch ramp lanes, add courtesy docks and walkway at the Windy Point boat ramp. |
$51,804 |
|
Sandusky County
Park District |
Sandusky |
Dredge launch area. Replace ramp at the Wolfe Creek Canoe Launch. |
$11,676 |
|
City of Rossford |
Wood |
Rebuilding Rossford Marina docks parking lots. |
$57,932 |
|
Eastlake Ohio
Port Authority |
Lake |
Flood control and boating access dredging on the Chagrin River. |
$277,933 |
|
City of Napoleon |
Henry |
New restroom. Repave existing drive and parking area. |
$274,400 |
|
City of East Liverpool |
Columbiana |
Construct a 133' sheet-pile wall with a 12' wide walkway along the wall at Broadway Wharf. |
$284,571 |
|
Village of Malta |
Morgan |
Construction of a 40' floating dock on the Muskingum River and a 15' bridge from the walkway to the dock. |
$18,281 |
|
Carroll Township |
Ottawa |
Dredging; extend the west groin of Locust Point/Turtle Creek breakwater 250' and extend the east groin 150'. |
$53,600 |
|
Ashtabula Township Park Commission |
Ashtabula |
Dredge approximately 20,000 cubic yards in bay area of park. |
$249,750 |
|
City of Huron |
Erie |
Construct a building for showers, restroom, lounge and registration-retail area. |
$585,000 |
|
Dillon State Park |
Muskingum |
Remove and replace a portion of the one lane ramp at Big Run. |
$6,000 |
|
Alum Creek State Park |
Delaware |
Replace courtesy docks at the New Galena, Cheshire, and Hollenback areas. |
$125,000 |
|
Fairport Harbor Port Authority |
Lake |
Complete installation of launch ramp transient docks from Phase 1; dredge pier and immediate pier access. |
$41,580 |
|
City of Sandusky |
Erie |
Dredge along the shoreline of the Shelby Street launch facility. |
$220,000 |
|
City of Marietta |
Washington |
Replace docks and improve bank stabilization. |
$184,100 |
|
Jerusalem Township |
Lucas |
Dredging of 840' from entrance to Wards Canal. |
$174,189 |
|
Grand Lake/St. Marys
State Park |
Mercer |
Replace existing gravel ramp with 14' ramp, add six docks, asphalt parking area and lighting for ramp and docks at the It’s It Road access site. |
$46,200 |
|
City of Sandusky |
Erie |
Replace existing gravel parking with asphalt pavement. |
$255,000 |
|
Portage Lakes State Park |
Summit |
Purchase and install four courtesy docks. |
$8,800 |
|
Shawnee State Park |
Scioto |
Convert the existing marina launch ramp pier to a handicapped accessible pier. |
$31,135 |
|
City of Logan |
Hocking |
Construct boat ramp, shoreline protection, crushed stone walkway under St. Rt. 93 bridge. |
$46,000 |
|
Village of Powhatan Point |
Belmont |
Add 23 docks, handicap accessible fishing pier. Repair existing restroom. |
$177,612 |
|
Muskingum Watershed Conservancy District |
Ashland |
Develop a two-lane boat launch ramp, access road, and parking area at Charles Mill Lake. |
$242,820 |
|
Mosquito Lake State Park |
Trumbull |
Replace 18 docks, and anchor pads and timber bumpers to the marina breakwall. |
$155,000 |
|
Cincinnati Park Board |
Hamilton |
Expand and relocate existing Riverfront Marina. Expand existing public landing, additional mooring facilities, expand existing boat launch ramps and parking, provide protected docking space. |
$330,000 |
|
|
TOTAL: |