| Park |
Amt |
Drawdown
Start - End
|
Refill
Start - End
|
Elevation After
Drawdown
|
Justification |
| Adams Lake |
5' |
12/10/07 - 12/21/07 |
01/28/08 - 02/11/08 |
761' |
Kill aquatic vegetation |
| Alum Creek |
3' |
10/01/07 - 11/01/07 |
03/15/08 - 04/15/08 |
885 |
Flood control |
Alum Creek-
Supplemental |
3' |
10/01/07 - 11/01/07 |
12/01/07 - 12/31/07 |
882 |
Repairs to campground ramp & Hollenback walkways |
| Blue Rock |
4' |
01/01/08 - 02/01/08 |
02/02/08 - 02/20/08 |
825' |
Reclaim beach sand, boat ramp repair, work drain valve |
| Buck Creek |
3' |
09/15/07 - 11/30/07 |
03/01/08 - 04/01/08 |
1009' |
Flood control |
| Buckeye Lake |
3' |
11/15/07 - 12/15/07 |
03/01/08 - 05/01/08 |
889.3' |
Dock maintenance & flood control |
| Caesar Creek |
3' |
09/01/07 - 12/01/07 |
04/01/08 - 05/01/08 |
846' |
Flood control |
| Cowan Lake |
5' |
11/13/07 - 12/31/07 |
02/27/08 - 05/01/08 |
955' |
Dock protection repairs, valve repair |
| Deer Creek |
14' |
10/01/07 - 11/30/07 |
04/01/08 - 04/15/08 |
796' |
Flood control |
| Delaware |
5' |
10/12/07 - 11/01/07 |
04/01/08 - 04/15/08 |
910' |
Flood control |
| Dillon |
3' |
11/02/07 - 12/01/07 |
04/01/08 - 04/15/08 |
734' |
Flood control |
| East Fork |
4' |
09/01/07 - 12/01/07 |
04/01/08 - 05/01/08 |
729' |
Flood control |
| East Fork -Supplemental |
5'
|
01/15/08 - 02/29/08 |
UNKNOWN
|
724' |
Ramp repair |
| Forked Run |
8' |
11/15/07 - 12/15/07 |
01/15/08 - 02/15/08 |
591' |
Reclamation of beach & ramp maintenance |
| Guilford Lake |
6' |
11/15/07 - 12/15/07 |
03/15/08 - 04/15/08 |
1131' |
Dock maintenance & flood control |
| Jackson Lake |
4-5' |
12/01/07 - 12/20/07 |
02/01/08 - 02/28/08 |
696-695' |
Reclaim beach sand, clean shoreline |
| Lake Loramie |
3"-6" |
03/01/08 - 04/15/08 |
05/01/08 - 05/31/08 |
955-954.5' |
Minimize farm drainage problems, and drainage improvements |
| Lake Loramie |
3"-6"
|
09/15/07 - 10-31/07 |
11/01/07 - 11/31/07 |
955-954.5' |
Minimize farm drainage problems, and drainage improvements |
| Lake Milton |
6'
|
10/15/07 - 12/31/07 |
03/15/08 - 05/01/08 |
942'
|
Protect private docks, dock/deck rehad, reclaim beach sand |
| Lake White |
3.1'
|
11/01/07 - 12/01/07 |
04/15/08 - 05/01/08 |
569.9'
|
Protect private docks & winter shoreline, beach repairs |
| Mosquito Lake |
3'
|
06/01/07 - 11/30/07 |
01/24/08- 04/15/08 |
898.4'
|
Flood control |
| Paint Creek |
10.5' |
10/17/07 - 11/30/07 |
04/01/08 - 04/15/08 |
787.5'
|
Flood control |
| Portage Lakes |
15" |
10/15/07 - 10/20/07 |
11/12/07 - 11/17/07 |
Multiple Lakes
|
Dock repair |
| Pymatuning |
2'
|
10/31/07 - 01/01/08 |
03/01/08 - 05/01/08 |
1006'
|
Flood control |
| Shawnee - Turkey Creek |
5'
|
10/29/07 - 11/12/07 |
02/25/08 - 03/10/08 |
735'
|
Reclaim beach sand |
| Strouds Run |
7'
|
12/01/07 - 01/21/08 |
03/01/08 - 04/15/08 |
653'
|
Ramp repair & reclaim beach sand |
| Tar Hollow |
8'
|
11/01/07 - 01/01/08
|
03/01/08 - 04/01/08
|
780'
|
Silt removal at resident camp beach |
| West Branch |
4.5' |
06/01/07 - 11/30/07 |
01/24/08 - 04/15/08 |
981'
|
Flood control |